班组长管理英文自我评价

时间:2023-11-16 07:28:36 自我评价 收藏本文 下载本文

班组长管理英文自我评价(共16篇)由网友“zhke1209”投稿提供,以下是小编整理过的班组长管理英文自我评价,欢迎阅读分享。

班组长管理英文自我评价

篇1:班组长管理英文自我评价

Suddenly, he had a busy quarter of. I really feel in the last work in the workshop leader and team staff support and support themselves matured. All the training workshop organized activities, I question their own shortcomings and have a deeper understanding of the team management's awareness has been further improved. Here, I combine my own state of mind, the actual work of self-criticism:

In terms of ideology, active, motivated.

As a team leader, I was in production, adhere to quality, safety supervision, careful observation of the idea of dynamic team of employees, pay attention to the method of communication with employees, and employees do their utmost to stand together, learn together, work together to complete the team focus on training for employees of all abilities, at work, I know the importance of learning, and to seize every opportunity to seriously study the best squad in continuous learning and practice, and continuously improve their management and communication skills.

At work, love and dedication, self-discipline.

At work, self-discipline and strict right to use, according to the size of a man. Adhere to the implementation of various systems, from time to time for the sake of employees, according to the rules of the company and the workshop with power; a man seeking truth from facts, on various issues raised by team staff never shied away from, the team also won the honor, thus creating a dynamic, motivated collectiveteam.

Self problems:

1, the theoretical water policy assessment is not high enough, not enough learning theory, management level is not high.

2, the first mode of consciousness is not strong. Strict with themselves, the standard is not high, but only so-so, not for the hard life, words and deeds can not be advanced to influence and lead the staff. Lack of awareness of the work of excellence in competition and fighting spirit of innovation, learning and studying theoretical knowledge and expertise without a certain height.

3, lack of innovation, lack of bright spots.

4, open-minded enough, failing to easily irritable, lack of control

Fourth, the corrective measures:

1, to strengthen the theory of learning, and constantly improve their political quality. Consciously strengthen the training, the concept of self-discipline to arm themselves, to those dedicated, positive, innovative colleagues study, work and more brains.

2, a man to be real high sense of responsibility, dedication, hard work, solid, despite the difficulties of courage to complete various tasks in the process of development of regional management manipulation workshop team to a higher level.

3, establish a team spirit. As a team leader, I have to keep a clear head, followed by the times, give full play to the initiative. To consciously strengthen the training, to learn and observe good at summing up at work, raise awareness of innovation

4, I work and new intern labor care enough. In the future study, work and more concerned about them than usual chat for thought trends.

In short, as a team leader in the work to play an exemplary role, should be based on their own work, and strive to do our own work, dedication, fine drilling business. Study and work in the future, I will continue to reflect on, continue to advance in the reflection. Humbly accept my colleagues around me suggestions and comments, and strive to improve themselves, to make their own progress, play a leading and exemplary role for the team good service, a squad leader bounden duty to do, and strive to do a good team leader.

篇2:班组长管理英文自我评价

In the past year, as a Communist party member, deeply felt concern and educational organizations, but also feel that they shoulder the head of the party's sustenance and responsibility. This year, by learning the Party's line, principles and policies and the party's Third Plenum of the spirit, a deep understanding of the important thought of “Three Represents” and the spirit and the importance of seeking truth and adhere to service learning. According to the Bureau of Safety and production tasks, work area at the beginning of the year, and the class workers together with reality, understand the situation, clear objectives, implement the plan. Due diligence, consciously engaged in practice for the full completion of the production tasks and achieve the safe operation of the team throughout the year to make up their own obligations. Famous model worker Xu Hu said it well: society is a big machine, the needs of different parts, as an alternative hydropower repairman, like a screw, they should keep in this position for the operation to make a big machine contribution parts. Plain language, awe-inspiring. Co-op itself in second class, and for a group of long, in fact, the production line of soldiers. In the second class and all the staff work together in life, though impoverished environment, busy, but always maintain a sense of balance, always keep in mind that he is a lead soldiers. As the first security team responsible person, feel the heavy responsibility, how to ensure the whole network - the Internet's largest resource network secretarial classes safe operation, and orderly production is their duty, it is also a special soldier. Own knowledge necessary to understand the business will be, but also good management. Many years of work in practice himself touched a superficial rule: as long as a thorough grasp of superior spirit, eyes down, the heart of the class of workers, combined with the actual situation due to the system should be able to find out the work of thinking, then gradual order to drive overall. Co-op is a special class team, Omo wide bottom, big job uncertainty, randomness, to improve safety in production and the overall work of the team must be between the team and between operations, the operation value with the operator, each management and the hook substation value between the start and improve cohesion and cooperation relations between each other, so that the upper and lower line, Ningchengyigu strength, so that the team form an organic unity. With some thought, after the beginning of the end of the restructuring team, in consultation with the team technicians and several key observations made to strengthen management team scores, developed a value management responsible for the system block specific regulations, clear responsibilities, to implement separately unified assessment. In specific operations and focus on the following two aspects: First, try to create harmony without losing principle a good atmosphere, creating a harmonious and relaxed working environment; the second is to play a team member enthusiasm and sense of ownership, achieve a high degree of democratic management team. Perfect to team leader as the core management staff workers as the backbone of the management system, so that everything was tubes, everything was done, everyone accountability duties, give full play to the initiative and creativity of every worker, and strictly enforce the team a series of rules and regulations, in front of the system to achieve equality. Strengthen awareness of self-management team members, within certain limits, to maximize the extent of their own energy, the team based management system, a self-examination, self-control, self-evaluation, so that the whole class of workers to establish a strong sense of responsibility and mission. Thus, the management team a solid foundation, and all aspects of work there is a guarantee. From the full year, the effect is obvious.

Well team overall, by the joint efforts of all employees, and to give full play to the enthusiasm of the team each employee must have a good image of men are the class of their own as long intervals of both producers and is not famous manager, I always make it clear that only set an example, take the lead, class members can be trusted to hear Jin, Qi efforts. He clung to a purpose of its own, asking others to do things that he do first; ask others to complete the task, the completion of its own first, put the whole team in his own image, to take concrete actions to influence team members, and to drive them. Year period for the global security situation is grim, the turning point of the security situation, promptly organize personnel to carry out class “Returning illegal discussion” and “Safety is not assured inspection” activities, and class staff together to talk about feelings, find the root cause, a more profound analysis of the presence of team work safety aspects, combined with the actual team has developed effective preventive measures, and to be guaranteed through the appropriate system to make it stable development of the security situation throughout the year, the work carried out smoothly and orderly. This year, production tasks and various aspects of the work is really busy, since the beginning of the power system, Zhenhai decentralized substation, a technician team to help the Bureau of Zhenhai Operation Course formation and technical training, increasing the pressure on the team management, and fitness in the appropriate period of time in the team to face three 110kv substation put into the task, and concentrate all production in February. As a running team, within one month of receiving the commissioning of three substations task, which is unprecedented, large workload is beyond imagination. Three substations put into operation not isolated to pull and related 110kv, 10kv load appears cutover, with daily operations is a significant increase, sometimes one day five or six substations also need to work, this staff has been fully tight , there are a lot of preparatory work must be completed and put into production as planned. Faced with this situation, their own deeply significant pressure, as team technician vacancies, both to co-ordinate their own daily work, but also take on responsibilities technician, check the drawings participation Code votes, transport regulation formulation, check equipment Devices tab, ordered production designer and arrange on-site training. To this end, the backbone and the team decided to discuss several break the routine, the original set of monthly work plan each week and refined to ensure safe and smooth completion of daily production at the same time, according to the specific circumstances of each value decomposition to everyone, and dynamically adjusts the progress of work per day, during the day can not be completed, then continue the evening rush. So for the overall work of the team, to give up a lot of time to rest. Other team personnel is also the overall situation, dedication, as long as the team needs, availability, more proactive plead indeed commendable. As the saying goes: people can remove the mountain. These production preparatory work can not be done routinely in the short term, miraculously in a month's time to fully complete, in order to ensure the smooth operation of three substations in time to create a solid foundation.

As a primary substation operation team, all the work than to ensure safe operation. The organization of some 20 people, 1xxxx substation to himself, to hold this position and maintain stable development, feel the heavy responsibility, which requires the work themselves into a ring must be in place to the point, without leaving any water, for themselves and their class two technicians in-depth process of actual daily production in the understanding and knowledge of the work of the law at the same time, from the beginning of the operation team from the back gate to the daily operation and management to develop appropriate measures: First, the establishment and improve the operation of large mission plan and weekly work plan. Every Friday afternoon, according to the network transmission task group, the elaboration of the work plan, arrange power, a clear division of work proposed precautions, the risk of pre-control point, and submit timely communication when values long, circulated by value, so peoplepeople aware beforehand prepared. Second, the establishment of large-scale operations before special inspection system substation by the hook value before the operation is responsible for 3-5 days and discharge measures to verify the remaining defects and related substation current problems, all kinds of anti-error operation of the arrangement, the column a detailed list; check the relevant substation types of safety equipment, ground wire and spare parts (emphasis levels fuses) the configuration,; check substation AC and DC lighting facilities. Third, the large monitor or technician operating at least one person to the scene, responsible for a large stop transmission and other complex operations of the organization and the coordination and supervision and work to ensure that the operation is correct. Fourth, the establishment of large-scale overhaul after operating system summary, sum up the experience of each operation and found problems, and this overhaul, the test results and the like. Fifth, in improving the number of related management systems, based on the large supply gap this year, according to the actual situation, the team prepared a three track records, dynamic monitoring (1, each team runs substation equipment defects and weaknesses Tip Sheet; 2 each substation main transformer heavy load monitoring and outlet table; 3, the substation equipment to hot spots and load table), by implementing a series of measures this year to compare the work smoothly and to guarantee a stable team up security situation, it would be their own masturbation lead to harvest it.

Recall work over the past year, a slight obtained, which received the care and guidance of the organization can not do without, but also inseparable from the class comrades work together, through thick and thin results. I am convinced that a person's capacity is limited, the key is what kind of attitude towards the work they are engaged in their own positions, doing a love one, down to earth, firmly grasp their own letter“now,” study hard, and constantly improve and enrich themselves and start from their own in charge of the work, from the moment regarding the start, the attitude of masters, conscientiously improve their own work, which is he has been the pursuit of desire.

篇3:班组长管理英文自我评价

The new year, we earnestly implement the specific requirements of five lines, combined with the actual center, specifically to carry out the following work “lean production management, 5s on-site management activities, safe and clean production, conduct activities, team management activities” to strengthen the training of team members,increase awareness. Take the lead in learning and the acquisition of knowledge about the team culture. Through study and training, so that the team clearly carried the team culture function, clear the Significance team culture, defined by guiding the team culture, incentives and constraints effect, to enhance the team staff cohesion and solidarity, so that the enthusiasm of the masses of workers and creativity to give maximize, to promote the integration and implementation team and business goals. Team overhaul I use spare time to organize team conducted a study, and were asked to learn after the great debate, and write on the “lean production management” understanding, from staff to discuss the results point of view, in terms of “lean production management ”understanding, or from their own ideology, they have been greatly improved, especially to make them feel tract, lean production, the primary consciousness, with the consciousness of innovation and improvement to be able to drive their lean production find ways to improve the course of the activity, and thus to achieve the target improvement.

Measures to develop the system, team building summary, on the basis of investigation and study on the proposed team building ideas, and then to corporate team building team from the Safety Culture Construction to the corporate team-building, we focus on “excellence, the pursuit of excellence” spirit, proposed a “study hard, beyond the self,” the learning concept, “concerned about security, love life”, “life first, safe for the day,” the security concept, “excellence, Yong-class struggle” the quality of ideas, a clear “zero accidents, dangerous and unpredictable full participation ”of the security principle, to further enhance the quality of the workforce, standardize basic management team, corporate culture so firmly founded on team culture.

In the future we want to pay close attention to team work in conjunction, find support team building. Summary of the work team building team-building activities must be attached to the cultural daily work. We first find the right way, from four aspects, the ideological and cultural team building and spiritual civilization, maintain employee education campaign and the ideological and political work, theoretical study and work combine to continuously enrich and deepen; the construction of safety culture and safety evaluation of the implementation of the combination, the establishment of large security mechanisms; continuously improve the theoretical knowledge of the workers and professional and technical level; Lean production system cultural construction with the company for a combination of the control standards, find deficiencies and improve my team membersexecution, team building norms.

篇4:班组长英文自我评价

This year, by learning the Party's line, principles and policies and the party's Third Plenum of the spirit, a deep understanding of the important thought of “Three Represents” and the spirit and the importance of seeking truth and adhere to service learning. According to the Bureau of Safety and production tasks, work area at the beginning of the year, and the class workers together with reality, understand the situation, clear objectives, implement the plan. Due diligence, consciously engaged in practice for the full completion of the production tasks and achieve the safe operation of the team throughout the year to make up their own obligations. Famous model worker Xu Hu said it well: society is a big machine, the needs of different parts, as an alternative hydropower repairman, like a screw, they should keep in this position for the operation to make a big machine contribution parts. Plain language, awe-inspiring. Co-op itself in second class, and for a group of long, in fact, the production line of soldiers. In the second class and all the staff work together in life, though impoverished environment, busy, but always maintain a sense of balance, always keep in mind that he is a lead soldiers. As the first security team responsible person, feel the heavy responsibility, how to ensure the whole network - the Internet's largest resource network secretarial classes safe operation, and orderly production is their duty, it is also a special soldier. Own knowledge necessary to understand the business will be, but also good management. Many years of work in practice himself touched a superficial rule: as long as a thorough grasp of superior spirit, eyes down, the heart of the class of workers, combined with the actual situation due to the system should be able to find out the work of thinking, then gradual order to drive overall. Co-op is a special class team, Omo wide bottom, big job uncertainty, randomness, to improve safety in production and the overall work of the team must be between the team and between operations, the operation value with the operator, each management and the hook substation value between the start and improve cohesion and cooperation relations between each other, so that the upper and lower line, Ningchengyigu strength, so that the team form an organic unity. With some thought, after the beginning of the end of the restructuring team, in consultation with the team technicians and several key observations made to strengthen management team scores, developed a value management responsible for the system block specific regulations, clear responsibilities, to implement separately unified assessment. In specific operations and focus on the following two aspects: First, try to create harmony without losing principle a good atmosphere, creating a harmonious and relaxed working environment; the second is to play a team member enthusiasm and sense of ownership, achieve a high degree of democratic management team. Perfect to team leader as the core management staff workers as the backbone of the management system, so that everything was tubes, everything was done, everyone accountability duties, give full play to the initiative and creativity of every worker, and strictly enforce the team a series of rules and regulations, in front of the system to achieve equality. Strengthen awareness of self-management team members, within certain limits, to maximize the extent of their own energy, the team based management system, a self-examination, self-control, self-evaluation, so that the whole class of workers to establish a strong sense of responsibility and mission. Thus, the management team a solid foundation, and all aspects of work there is a guarantee. From the full year, the effect is obvious.

Well team overall, by the joint efforts of all employees, and to give full play to the enthusiasm of the team each employee must have a good image of men are the class of their own as long intervals of both producers and is not famous manager, I always make it clear that only set an example, take the lead, class members can be trusted to hear Jin, Qi efforts. He clung to a purpose of its own, asking others to do things that he do first; ask others to complete the task, the completion of its own first, put the whole team in his own image, to take concrete actions to influence team members, and to drive them. Year period for the global security situation is grim, the turning point of the security situation, promptly organize personnel to carry out class “Returning illegal discussion” and “Safety is not assured inspection” activities, and class staff together to talk about feelings, find the root cause, a more profound analysis of the presence of team work safety aspects, combined with the actual team has developed effective preventive measures, and to be guaranteed through the appropriate system to make it stable development of the security situation throughout the year, the work carried out smoothly and orderly. This year, production tasks and various aspects of the work is really busy, since the beginning of the power system, Zhenhai decentralized substation, a technician team to help the Bureau of Zhenhai Operation Course formation and technical training, increasing the pressure on the team management, and fitness in the appropriate period of time in the team to face three 110kv substation put into the task, and concentrate all production in February. As a running team, within one month of receiving the commissioning of three substations task, which is unprecedented, large workload is beyond imagination. Three substations put into operation not isolated to pull and related 110kv, 10kv load appears cutover, with daily operations is a significant increase, sometimes one day five or six substations also need to work, this staff has been fully tight , there are a lot of preparatory work must be completed and put into production as planned. Faced with this situation, their own deeply significant pressure, as team technician vacancies, both to co-ordinate their own daily work, but also take on responsibilities technician, check the drawings participation Code votes, transport regulation formulation, check equipment Devices tab, ordered production designer and arrange on-site training. To this end, the backbone and the team decided to discuss several break the routine, the original set of monthly work plan each week and refined to ensure safe and smooth completion of daily production at the same time, according to the specific circumstances of each value decomposition to everyone, and dynamically adjusts the progress of work per day, during the day can not be completed, then continue the evening rush. So for the overall work of the team, to give up a lot of time to rest. Other team personnel is also the overall situation, dedication, as long as the team needs, availability, more proactive plead indeed commendable. As the saying goes: people can remove the mountain. These production preparatory work can not be done routinely in the short term, miraculously in a month's time to fully complete, in order to ensure the smooth operation of three substations in time to create a solid foundation.

As a primary substation operation team, all the work than to ensure safe operation. The organization of some 20 people, 1xxxx substation to himself, to hold this position and maintain stable development, feel the heavy responsibility, which requires the work themselves into a ring must be in place to the point, without leaving any water, for themselves and their class two technicians in-depth process of actual daily production in the understanding and knowledge of the work of the law at the same time, from the beginning of the operation team from the back gate to the daily operation and management to develop appropriate measures: First, the establishment and improve the operation of large mission plan and weekly work plan. Every Friday afternoon, according to the network transmission task group, the elaboration of the work plan, arrange power, a clear division of work proposed precautions, the risk of pre-control point, and submit timely communication when values long, circulated by value, so peoplepeople aware beforehand prepared. Second, the establishment of large-scale operations before special inspection system substation by the hook value before the operation is responsible for 3-5 days and discharge measures to verify the remaining defects and related substation current problems, all kinds of anti-error operation of the arrangement, the column a detailed list; check the relevant substation types of safety equipment, ground wire and spare parts (emphasis levels fuses) the configuration,; check substation AC and DC lighting facilities. Third, the large monitor or technician operating at least one person to the scene, responsible for a large stop transmission and other complex operations of the organization and the coordination and supervision and work to ensure that the operation is correct. Fourth, the establishment of large-scale overhaul after operating system summary, sum up the experience of each operation and found problems, and this overhaul, the test results and the like. Fifth, in improving the number of related management systems, based on the large supply gap this year, according to the actual situation, the team prepared a three track records, dynamic monitoring (1, each team runs substation equipment defects and weaknesses Tip Sheet; 2 each substation main transformer heavy load monitoring and outlet table; 3, the substation equipment to hot spots and load table), by implementing a series of measures this year to compare the work smoothly and to guarantee a stable team up security situation, it would be their own masturbation lead to harvest it.

Recall work over the past year, a slight obtained, which received the care and guidance of the organization can not do without, but also inseparable from the class comrades work together, through thick and thin results. I am convinced that a person's capacity is limited, the key is what kind of attitude towards the work they are engaged in their own positions, doing a love one, down to earth, firmly grasp their own letter“now,” study hard, and constantly improve and enrich themselves and start from their own in charge of the work, from the moment regarding the start, the attitude of masters, conscientiously improve their own work, which is he has been the pursuit of desire.

篇5:工厂班组长英文自我评价

Blink of an eye, busy in a quarter. I really feel in the past work, leadership and team in the workshop staff support and support, their gradually mature. Through the workshop organization of various training and activities, I have their own problems and deficiencies have a deeper understanding of the team management awareness has also been further improved. Here, I combine their own ideological situation, the actual work of self-criticism:

篇6:工厂班组长英文自我评价

After finishing the workshop is like a big family, I live and work in this warm family every day, as a member of this family I think I have the obligation and responsibility to build her better harmony. Therefore, over the past year, I plot and workshop improvement activities, and mobilize the enthusiasm of team members, the use of collective wisdom of the workshop made a lot of valuable improvements.

篇7:工厂班组长英文自我评价

Safety management did not do bit, strength is not enough; safety training is not in place; check not in place. In many cases, due to the labor intensity of the staff is larger, more physical exertion, so the completion of the day's output, do the work of sorting the scene ignored the phenomenon, there are irregularities in the operation of the repeated repeated crushing accidents . Now want to come to these accidents, I have an inescapable responsibility. First: in the organization and management team in the process of daily safety training is not really so that every employee will always be safe production in mind; Second: in the security check did not do the whole process of tracking the entire inspection; Finally: in the event of an accident did not promptly Sum up lessons learned to avoid the recurrence of similar incidents. So that my staff suffered pain, so that the damage to the honor and interests of the workshop I am very self-blame. To this end, I decided to work in the future to strengthen the intensity of safety training and improve the form of training and strengthen the security team security responsibilities, so that each team staff are aware of the importance of safety in production, resulting in “everyone's attention to safety Production, everyone involved in production safety, ”a good atmosphere.

篇8:工厂班组长英文自我评价

The new year represents a new beginning, new opportunities and new challenges. I will redouble their efforts to seriously improve the business, the level of work for the company and workshop development, contribute their own strength.

I am determined to do the following in the following year:

1. Strengthen learning, broaden the knowledge. Strive to study stamping expertise and related management knowledge;

2. In the principle of seeking truth from facts, so the situation issued, the next situation reported; really good leadership of the assistant;

3. Strengthen communication and cooperation with the workshop brothers and team, to the advanced team to learn, strengthen management, and strive to make the team to form a solid, hard work and good atmosphere;

4. Fully completed the workshop to the various tasks for the workshop to bring out a tough fight, hard-working team.

Finally, I hope the company leadership in the future work, as always, support me, I will be more outstanding performance of the company's return on the leadership of care and love, because I will always work!Thank you!

篇9:工厂班组长英文自我评价

Time flies, years have been quietly away from us, looking back over the past year, the heart can not help but be filled with emotion. Over the past year, the company leadership and colleagues in the support and help, I am strict demands on themselves, in accordance with the requirements of the company and the workshop, to better complete their own work, and through efforts to make their own work in the new modelOf the breakthrough, the work has been greatly improved. The work in 20xx is summarized as follows:

篇10:工厂班组长英文自我评价

Because I did not work for a long time, because of the chaotic management of the workshop, so in the workshop there are many problems to be solved. In order to solve these problems, I propose to take measures to regulate the implementation of positive incentive system in 20xx. For the better performance of the team to give employees plus assessment points, and for the poor performance of the staff are determined to deduct a certain assessment points. Take this rewards and punishments, fair and impartial assessment methods, I believe that the implementation of team staff will be greatly improved and will improve the team cohesion.

篇11:工厂班组长英文自我评价

Although the management level of the team has been improved in the past year, there are still some problems, such as: the standardized work situation of the staff to be improved, the technical level of the staff to be improved, the enthusiasm of the staff has not been fully mobilized high-level management, there is no high-quality staff, there is no high-quality products. Therefore, I will focus on the future work to improve the overall quality of the team and staff issues, make full use of spare time, and more arrangements for some of the knowledge of the standardization of training, strive for a shorter period of time so that the overall quality of staff has a larger Promotion.

篇12:工厂班组长英文自我评价

Because of the heavy burden of their own body, and their knowledge, ability and experience with a good competent monitor have a certain distance, so the total can not be taken lightly, has been learning, learning to the books, learning to the surrounding leaders, To learn from colleagues, and actively improve the quality of their business, and strive to improve work efficiency and quality of work, for work ugh this year's efforts to feel that they still have some progress, be able to calmly deal with the daily work of the various problems, in the organization and management capacity, comprehensive analysis, coordination and writing skills and verbal ability, etc. A great improvement to ensure that the work of the normal operation of the post, to the right attitude towards the various tasks, with a strong professionalism, sense of responsibility.

篇13:工厂班组长英文自我评价

Quality is produced, rather than check out, that is to say about total quality management, in accordance with the objectives and requirements to seriously do a good job in every aspect, every the same time quality inspection is very important, especially in the production process of quality inspection can effectively avoid the occurrence of quality accidents and quality problems, after the event for the prevention and control in advance, change from passive to ough the company from top to bottom are beginning to pay attention to quality, but in practice there are still many problems, especially between the team, for example, in the weaving process there are many areas to be improved. To solve these problems is not a team can do a good job, which requires a number of relevant team work together, I think in order to do a good job of quality, we must grasp the “strict, fine, real” principle, to strict management, Careful and meticulous, pay close attention to implementation.

篇14:工厂班组长英文自我评价

With the expansion of the company's size and visibility of the increasing customer Xinhui the quality requirements are also getting higher and higher, so the company's high-level attention to product quality has also been referred to an unprecedented level. Xinhui as a whole the last pass, after finishing the responsibility to shoulder more and more. I know that as a workshop monitor, their work directly affect the quality of the work of the workshop. For the company's responsibility, I have been in quality control has been lax, and colleagues in a timely manner and timely communication and exchange of information, for the production process problems, defects never easily let go. At the same time to strengthen the importance of the quality of staff awareness, require everyone to do a good job self-inspection and mutual inspection work to ensure that a problem from the class into the market.

篇15:工厂班组长英文自我评价

In the ideological, positive, positive motivated.

As a team leader, I am in the production, adhere to the quality, safety supervision, careful observation of the team members of the ideological trends, pay attention to communication methods and staff to make the greatest efforts and staff stand together to learn and work together to complete the team , Pay attention to the training of staff ability, at work, I know the importance of learning, seize every opportunity to earnestly study the excellent monitor, in continuous learning and practice constantly improve their management level and communication skills.

At work, dedication and love, self-discipline.

In work, strict self-discipline, strict to use, according to the size of re to the implementation of various systems, from time to time for the sake of employees, according to the rules of the company and the power to move the shop; a realistic man, the team raised a variety of staff questions never avoid, team also received the honor, team.

Self-existing problems:

1, policy theory Water evaluation is not high enough, the theory of learning is not enough, the management level is not high.

2, the first mode of consciousness is not strong. On their own lax, the standard is not high, just flies, not flies hard, can not use advanced words and deeds affect and drive employees. The work of the lack of first to strive for excellence and fighting spirit of innovation, study and study the theoretical knowledge and professional knowledge is not a certain height.

3, lack of awareness of innovation, the lack of bright spots.

4, open-minded enough, failing to easily impatient, lack of control

Fourth, the corrective measures:

1, to strengthen theoretical study, and constantly improve their political quality. Consciously strengthen the exercise to the idea of self-discipline armed with their own minds, to those dedicated, positive, innovative colleagues to learn, work more brains.

2, in order to be a high sense of responsibility, dedication, hard work, solid, the courage to advance the work to complete the task, in the process of regional management of the workshop team to a higher level.

3, establish team team spirit. As a team leader, I want to always keep a clear head, keep up with the pulse of the times, give full play to the subjective initiative. To consciously strengthen the exercise, at work, learn to sum up and observe, to improve the sense of pioneering and innovative

4, I am concerned about the labor and the new interns is not enough. In the future study, work more concerned about them, usually more chat to understand the ideological trends.

In short, as a team leader in the work to play an exemplary role, should be based on their own work, and strive to do their jobs, love and respect their jobs, fine drilling business. In the future study and work, I will continue to reflect on the continuous progress in the reflection. Humbly accept my colleagues around me to make suggestions and opinions, and strive to improve themselves, so that their continuous progress, play an exemplary role for the team to serve good, do a monitor should do the obligation, and strive to be a good team leader.

篇16:工厂班组长英文自我评价

After finishing the relative to the company's other workshops for more security risks, more prone to accidents, in the past 20xx, there have been several work-related accidents, these accidents have been to the company and the workshop losses. “Fool with blood for the lesson, the wise use of lessons to avoid accidents”, although the power is not great, but shoulders the whole class of more than a dozen employees of the important task of life safety. Therefore, for security work I have never relaxed, Yueyue Jiang, every day.

工程管理者自我评价参考

管理者自我评价语录

体育课双语教学总结

寒假实践活动英文自我评价

医疗质量综合评价检查汇报材料

小组合作教学初中英语论文

交通工程求职信

班组长管理经验综述

秋季学期小学部教学的工作计划

中英文自我评价

班组长管理英文自我评价
《班组长管理英文自我评价.doc》
将本文的Word文档下载到电脑,方便收藏和打印
推荐度:
点击下载文档

【班组长管理英文自我评价(共16篇)】相关文章:

售前售后技术支持个人简历2023-08-28

教学质量提升工作方案2022-12-28

物流经理中英文自我评价2022-12-06

第二学期学校卫生保健工作计划2022-05-07

小学部的工作计划2024-01-06

巡察发现共性问题范文2022-05-07

交通工程相关论文2023-10-09

学校双语教学总结2023-09-27

一年级阅读写作教学计划2023-11-23

小学双语教学论文2022-05-02

点击下载本文文档