合同翻译中最易混淆的七组词语

时间:2024-02-02 07:55:30 词语 收藏本文 下载本文

合同翻译中最易混淆的七组词语(共9篇)由网友“矢落”投稿提供,下面就是小编整理过的合同翻译中最易混淆的七组词语,希望大家喜欢。

合同翻译中最易混淆的七组词语

篇1:合同翻译中最易混淆的七组词语

一、abide by 与 comply with

abide by 与 comply with 都有“遵守”的意思.但是当主语是“人”时,英译“遵守”须用 abide by。当主语是非人称时,则用 comply with 英译“遵守”。

例:Both parties Shall abide by the contractual stipulations.

双方都应遵守合同规定。

All the activities of both parties shall comply with the contractual stipulations.

双方的一切活动都应遵守合同规定。

二、shipping advice 与 shipping instructions

shipping advice 是“装运通知”,是由出口商(卖主)发给进口商(买主)的。然而 shipping instructions 则是“装运须知”,是进口商(买主)发给出口商(卖主)的。另外要注意区分 delivery note (送货回执) 与delivery order (交货单),vendor(卖主)与 vendee(买主),consignor(发货人)与 consignee(收货人)。上述这四对词语在英译时、极易发生笔误。

三、change A to B 与 change A into B

“把 A 改为 B”应该翻译成“change A to B”,而“把 A 折合成/兑换成 B”应该翻译成用“change A into B”,两者不可混淆。

例:交货期改为 5 月并将人民币折合成美元。

Both parties agree that change the time of shipment to June and change Renminbi into US dollar.

四、ex/per/by

源自拉丁语的介词 ex 与 per 有各自不同的含义。翻译由某轮船“运来”的货物时用 ex,由某轮船“运走”的货物用 Per,而由某轮船“承运”用 by。

例:由“维多利亚”轮运走/运来/承运的最后一批货将于 8 月 10 日抵达伦敦。

The last batch per/ex/by S.S. “Victoria” will arrive at London on 10th August (S.S. = Steamship)

五、in 与 after

当英译“多少天之后”的时间时,往往是指“多少天之后”的确切的一天,所以必须用介词 in,而不能用 after,因为介词 after 指的是“多少天之后”的不确切的任何一天。

例:该货于 8 月 10 日由“东风”轮运出,41 天后抵达鹿纽约港。

The good shall be shipped per M.V. “Dong Feng” on 10th August and are due to arrive at New York Port in 41 days. (M.V.= motor vessel)

注:这里如果改用after的话,就是指在41天之后的某一天到达,而不是41天后。

六、on/upon 与 after

当翻译“……到后,就……” 时,用介词 on/upon,而不用 after,因为 after 表示“之后”的时间不明确。

例:发票货值须货到付给。

The invoice value is to be paid on/upon arrival of the goods.

七、by 与 before

当翻译终止时间时,比如“在某月某日之前”,如果包括所指定日期时,就用介词 by;如果不包括所指定日期,即指到所写日期的前一天为止,就要用介词 before。

例:卖方须在 6 月 15 日前将货交给买方。

The vendor shall deliver the goods to the vendee by June 15.(or: before June 16,说明含 6 月 15 日在内。如果不含 6 月 15 日,就直接译为 by June 14 或者 before June 15。)

[合同翻译中最易混淆的七组词语]

篇2:合同翻译中最易混淆的词语

合同翻译中最易混淆的词语

合同翻译时,尤其是翻译商务合同时,常常由于选词不当而寻致词不达意或者意思模棱两可,有时甚至表达的是完全不同的含义。因此了解与掌握极易混淆的词语的区别是极为重要的,是提高合同翻译质量的关键因素之一,现把常用且易混淆的七对词语,用典型实例论述如下。

一、abide by 与 comply with

abide by 与 comply with 都有“遵守”的意思.但是当主语是“人”时,英译“遵守”须用 abide by。当主语是非人称时,则用 comply with 英译“遵守”。

例:Both parties Shall abide by the contractual stipulations.双方都应遵守合同规定。

All the activities of both parties shall comply with the contractual stipulations.双方的一切活动都应遵守合同规定。

二、shipping advice 与 shipping instructions

shipping advice 是“装运通知”,是由出口商(卖主)发给进口商(买主)的。然而 shipping instructions 则是“装运须知”,是进口商(买主)发给出口商(卖主)的。另外要注意区分 delivery note (送货回执) 与delivery order (交货单),vendor(卖主)与 vendee(买主),consignor(发货人)与 consignee(收货人)。上述这四对词语在英译时、极易发生笔误。

三、change A to B 与 change A into B

“把 A 改为 B”应该翻译成“change A to B”,而“把 A 折合成/兑换成 B”应该翻译成用“change A into B”,两者不可混淆。

例:交货期改为 5 月并将人民币折合成美元。Both parties agree that change the time of shipment to June and change Renminbi into US dollar.

四、ex/per/by

源自拉丁语的介词 ex 与 per 有各自不同的含义。翻译由某轮船“运来”的货物时用 ex,由某轮船“运走”的货物用 Per,而由某轮船“承运”用 by。

例:由“维多利亚”轮运走/运来/承运的最后一批货将于 8 月 10 日抵达伦敦。The last batch per/ex/by S.S. “Victoria” will arrive at London on 10th August (S.S. = Steamship)

五、in 与 after

当英译“多少天之后”的`时间时,往往是指“多少天之后”的确切的一天,所以必须用介词 in,而不能用 after,因为介词 after 指的是“多少天之后”的不确切的任何一天。

例:该货于 8 月 10 日由“东风”轮运出,41 天后抵达鹿纽约港。The good shall be shipped per M.V. “Dong Feng” on 10th August and are due to arrive at New York Port in 41 days. (M.V.= motor vessel)

注:这里如果改用after的话,就是指在41天之后的某一天到达,而不是41天后。

六、on/upon 与 after

当翻译“……到后,就……” 时,用介词 on/upon,而不用 after,因为 after 表示“之后”的时间不明确。

例:发票货值须货到付给。The invoice value is to be paid on/upon arrival of the goods.

七、by 与 before

当翻译终止时间时,比如“在某月某日之前”,如果包括所指定日期时,就用介词 by;如果不包括所指定日期,即指到所写日期的前一天为止,就要用介词 before。

例:卖方须在 6 月 15 日前将货交给买方。The vendor shall deliver the goods to the vendee by June 15.(or: before June 16,说明含 6 月 15 日在内。如果不含 6 月 15 日,就直接译为 by June 14 或者 before June 15。)

篇3:商务合同英译中易混淆的词语

英译商务合同时,常常由于选同不当而寻致词不达意或者意思模棱两可,有时甚至表达的是完全不同的含义。因此了解与掌握极易混淆的词语的区别是极为重要的,是提高英译质量的关键因素之一,现把常用且易混淆的七对词语,用典型实例论述如下:

shipping advice 与 shipping instructions

shipping advice 是“装运通知”,是由出口商(卖主)发给进口商(买主)的。然而 shipping instructions 则是“装运须知”,是进口商(买主)发给出口商(卖主)的。另外要注意区分 vendor(卖主)与 vendee(买主),consignor(发货人)与 consignee(收货人)。上述这三对词语在英译时、极易发生笔误。

abide by 与 comply with

abide by 与 comply with 都有“遵守”的意思.但是当主语是“人”时,英译“遵守”须用 abide by。当主语是非人称时,则用 comply with 。

例 3:双方都应遵守/双方的一切活动都应遵守合同规定。

Both parties Shall abide by/All the activities of both parties shall comply

with the contractual stipulations.

change A to B 与 change A into B

英译“把 A 改为 B”用change A to B,英译“把 A 折合成/兑换成 B”用change A into B,两者不可混淆。

例 4:交货期改为 8 月并将美元折合成人民币。

Both parties agree that change the time of shipment to August and change US dollar into Renminbi.

ex 与 per

源自拉丁语的介词 ex 与 per 有各自不同的含义。英译由某轮船“运来”的货物时用 ex,由某轮船“运走”的货物用 per,而由某轮船“承运”用 by。

例 5:由“维多利亚”货轮运走/运来/承运的最后一批货将于 10 月 1 日抵达伦敦。

The last batch per/ex/by S.S. “Victoria” will arrive at London on October

(S.S. = Steamship)

in 与 after

当英译“多少天之后”的时间时,往往是指“多少天之后”的确切的一天,所以必须用介词 in,而不能用 after,因为介词 after 指的是“多少天之后”的不确切的任何一天。

例 6:该货于 11 月 10 日由“东风”轮运出,140 天后抵达鹿特丹港。

The good shall be shipped per M.V. “Dong Feng” on November 10 and are due

to arrive at Rottedaml in 140 days. (M.V.= motor vessel)

on/upon 与 after

当英译“……到后,就……”时,用介词 on/upon,而不用 after,因为 after 表示“之后”的时间不明确。

例 7:发票货值须货到支付。

The invoice value is to be paid on/upon arrival of the goods.

by 与 before

当英译终止时间时,比如“在某月某日之前”,如果包括所写日期时,就用介词 by;如果不包括所写日期,即指到所写日期的前一天为止,就要用介词 before。

例 8:卖方须在 6 月 15 日前将货交给买方。

The vendor shall deliver the goods to the vendee by June 15.(or: before

June 16,说明含 6 月 15 日在内。如果不含 6 月 15 日,就译为 by June 14 或者 before June 15。)

篇4:商务合同英译中易混淆的词语

商务合同英译中易混淆的词语

英译商务合同时,常常由于选同不当而寻致词不达意或者意思模棱两可,有时甚至表达的是完全不同的含义,商务合同英译中容易混淆的词语。因此了解与掌握极易混淆的词语的区别是极为重要的,是提高英译质量的关键因素之一,现把常用且易混淆的七对词语,用典型实例论述如下:

shipping advice 与 shipping instructions

shipping advice 是“装运通知”,是由出口商(卖主)发给进口商(买主)的。

然而 shipping instructions 则是“装运须知”,是进口商(买主)发给出口商(卖主)的'。另外要注意区分 vendor(卖主)与 vendee(买主),consignor(发货人)与 consignee(收货人)。上述这三对词语在英译时、极易发生笔误。

abide by 与 comply with

abide by 与 comply with 都有“遵守”的意思.但是当主语是“人”时,英译“遵守”须用 abide by。当主语是非人称时,则用 comply with 。

例 1:双方都应遵守/双方的一切活动都应遵守合同规定。

Both parties Shall abide by/All the activities of both parties shall comply

with the contractual stipulations.

change A to B 与 change A into B

英译“把 A 改为 B”用change A to B,英译“把 A 折合成/兑换成 B”用change A into B,两者不可混淆,商务英语《商务合同英译中容易混淆的词语》。

例 2:交货期改为 8 月并将美元折合成人民币。

Both parties agree that change the time of shipment to August and change US dollar into Renminbi.

ex 与 per

源自拉丁语的介词 ex 与 per 有各自不同的含义。英译由某轮船“运来”的货物时用 ex,由某轮船“运走”的货物用 per,而由某轮船“承运”用 by。

例 3:由“维多利亚”货轮运走/运来/承运的最后一批货将于 10 月 1 日抵达伦敦。

The last batch per/ex/by S.S. “Victoria” will arrive at London on October

(S.S. = Steamship)

in 与 after

当英译“多少天之后”的时间时,往往是指“多少天之后”的确切的一天,所以必须用介词 in,而不能用 after,因为介词 after 指的是“多少天之后”的不确切的任何一天。

例 4:该货于 11 月 10 日由“东风”轮运出,140 天后抵达鹿特丹港。

The good shall be shipped per M.V. “Dong Feng” on November 10 and are due

to arrive at Rottedaml in 140 days. (M.V.= motor vessel)

on/upon 与 after

当英译“……到后,就……”时,用介词 on/upon,而不用 after,因为 after 表示“之后”的时间不明确。

篇5:商务合同英译中易混淆的词语分析

商务合同英译中易混淆的词语分析

shipping advice 与 shipping instructions

shipping advice 是“装运通知”,是由出口商(卖主)发给进口商(买主)的。然而 shipping instructions 则是“装运须知”,是进口商(买主)发给出口商(卖主)的。另外要注意区分 vendor(卖主)与 vendee(买主),consignor(发货人)与 consignee(收货人)。上述这三对词语在英译时、极易发生笔误。

abide by 与 comply with

abide by 与 comply with 都有“遵守”的意思.但是当主语是“人”时,英译“遵守”须用 abide by。当主语是非人称时,则用 comply with 。

例 3:双方都应遵守/双方的一切活动都应遵守合同规定。

Both parties Shall abide by/All the activities of both parties shall comply

with the contractual stipulations.

change A to B 与 change A into B

英译“把 A 改为 B”用change A to B,英译“把 A 折合成/兑换成 B”用change A into B,两者不可混淆。

例 4:交货期改为 8 月并将美元折合成人民币。

Both parties agree that change the time of shipment to August and change US dollar into Renminbi.

ex 与 per

源自拉丁语的介词 ex 与 per 有各自不同的含义。英译由某轮船“运来”的货物时用 ex,由某轮船“运走”的货物用 per,而由某轮船“承运”用 by。

例 5:由“维多利亚”货轮运走/运来/承运的最后一批货将于 10 月 1 日抵达伦敦。

The last batch per/ex/by S.S. “Victoria” will arrive at London on October

(S.S. = Steamship)

in 与 after

当英译“多少天之后”的时间时,往往是指“多少天之后”的`确切的一天,所以必须用介词 in,而不能用 after,因为介词 after 指的是“多少天之后”的不确切的任何一天。

例 6:该货于 11 月 10 日由“东风”轮运出,140 天后抵达鹿特丹港。

The good shall be shipped per M.V. “Dong Feng” on November 10 and are due

to arrive at Rottedaml in 140 days. (M.V.= motor vessel)

on/upon 与 after

当英译“……到后,就……”时,用介词 on/upon,而不用 after,因为 after 表示“之后”的时间不明确。

例 7:发票货值须货到支付。

The invoice value is to be paid on/upon arrival of the goods.

by 与 before

当英译终止时间时,比如“在某月某日之前”,如果包括所写日期时,就用介词 by;如果不包括所写日期,即指到所写日期的前一天为止,就要用介词 before。

例 8:卖方须在 6 月 15 日前将货交给买方。

The vendor shall deliver the goods to the vendee by June 15.(or: before

June 16,说明含 6 月 15 日在内。如果不含 6 月 15 日,就译为 by June 14 或者 before June 15。)

篇6:合同英译中容易混淆的词语

Section E

Steven: I think I have to leave now.

Lily: Must you go soon?

Steven: Im afraid I really have to .

Lily: Well, it was fun to get together again.

句型篇

I have a meeting soon.

I have an engagement2 soon.

I have an engagement very shortly3.

I have an date very shortly.

I think Id better go now.

I think I should go now.

I think I ought to go now.

I think I must go now.

Its getting dark.

Its getting dark outside.

Ive to go quite soon.

I must go quite soon.

I must leave quite soon.

Ive got to go leave in a few minutes.

It was fun to get together again.

It was exciting to get together again.

It was exciting to talk to each other.

篇7:商务合同英译中极易混淆的词语

商务合同英译中极易混淆的词语

英译商务合同时,常常由于选同不当而寻致词不达意或者意思模棱两可,有时甚至表达的是完全不同的含义。因此了解与掌握极易混淆的词语的区别是极为重要的,现把常用且易混淆的七对词语,用典型实例论述如下。

1 shipping advice 与 shipping instructions

shipping advice 是“装运通知”,是由出口商(卖主)发给进口商(买主)的。然而 shipping instructions 则是“装运须知”,是进口商(买主)发给出口商(卖主)的。另外要注意区分 vendor(卖主)与 vendee(买主),consignor(发货人)与 consignee(收货人)。上述这三对词语在英译时、极易发生笔误。

abide by 与 comply with 都有“遵守”的意思.但是当主语是“人”时,英译“遵守”须用 abide by。当主语是非人称时,则用 comply with 英译“遵守”。

例:Both parties shall abide by the contractual stipulations. 双方都应遵守合同规定。

All the activities of both parties shall comply with the contractual stipulations. 双方的`一切活动都应遵守合同规定。

2。change A to B 与 change A into B

英译“把 A 改为 B”用“change A to B”,英译“把 A 折合成/兑换成 B”用“change A into B”,两者不可混淆。

例:Both parties agree that change the time of shipment to August and change US dollar into renminbi. 交货期改为8月并将美元折合成人民币。

3 ex 与 per

源自拉丁语的介词 ex 与 per 有各自不同的含义。英译由某轮船“运来”的货物时用 ex,由某轮船“运走”的货物用 per,而由某轮船“承运”用 by。

例:The last batch per/ex/by S.S.“Victoria” will arrive at London on October (S.S. = Steamship) 由“维多利亚”轮运走/运来/承运的最后一批货将于 10 月 1 日抵达伦敦。

4 in 与 after

当英译“多少天之后”的时间时,往往是指“多少天之后”的确切的一天,所以必须用介词 in,而不能用 after,因为介词 after 指的是“多少天之后”的不确切的任何一天。

例:The good shall be shipped per M.V.“Dong Feng” on November 10 and are due to arrive at Rottedaml in 140 days. (M.V.= motor vessel) 该货于 11 月 10 日由“东风”轮运出,41 天后抵达鹿特丹港。

5 on/upon 与 after

当英译“……到后,就……”时,用介词 on/upon,而不用 after,因为 after 表示“之后”的时间不明确。

例:The invoice value is to be paid on/upon arrival of the goods. 发票货值须货到付给。

6 by 与 before

当英译终止时间时,比如“在某月某日之前”,如果包括所写日期时,就用介词 by;如果不包括所写日期,即指到所写日期的前一天为止,就要用介词 before。

例:The vendor shall deliver the goods to the vendee by June 15.卖方须在 6 月 15 日前将货交给买方。(or: before June 16,说明含 6 月 15 日在内。如果不含 6 月 15 日,就译为 by June 14 或者 before June 15。)

篇8:商务合同英译中容易混淆的词语

商务合同英译中容易混淆的词语

英译商务合同时,常常由于选同不当而寻致词不达意或者意思模棱两可,有时甚至表达的是完全不同的含义。因此了解与掌握极易混淆的词语的区别是极为重要的',是提高英译质量的关键因素之一,现把常用且易混淆的七对词语,用典型实例论述如下:

shipping advice 与 shipping instructions

shipping advice 是“装运通知”,是由出口商(卖主)发给进口商(买主)的。

然而 shipping instructions 则是“装运须知”,是进口商(买主)发给出口商(卖主)的。另外要注意区分 vendor(卖主)与 vendee(买主),consignor(发货人)与 consignee(收货人)。上述这三对词语在英译时、极易发生笔误。

abide by 与 comply with

abide by 与 comply with 都有“遵守”的意思.但是当主语是“人”时,英译“遵守”须用 abide by。当主语是非人称时,则用 comply with 。

例 3:双方都应遵守/双方的一切活动都应遵守合同规定。

Both parties Shall abide by/All the activities of both parties shall comply

with the contractual stipulations.

change A to B 与 change A into B

英译“把 A 改为 B”用change A to B,英译“把 A 折合成/兑换成 B”用change A into B,两者不可混淆。

例 4:交货期改为 8 月并将美元折合成人民币。

Both parties agree that change the time of shipment to August and change US dollar into Renminbi.

ex 与 per

源自拉丁语的介词 ex 与 per 有各自不同的含义。英译由某轮船“运来”的货物时用 ex,由某轮船“运走”的货物用 per,而由某轮船“承运”用 by。

例 5:由“维多利亚”货轮运走/运来/承运的最后一批货将于 10 月 1 日抵达伦敦。

The last batch per/ex/by S.S. “Victoria” will arrive at London on October

(S.S. = Steamship)

in 与 after

当英译“多少天之后”的时间时,往往是指“多少天之后”的确切的一天,所以必须用介词 in,而不能用 after,因为介词 after 指的是“多少天之后”的不确切的任何一天。

例 6:该货于 11 月 10 日由“东风”轮运出,140 天后抵达鹿特丹港。

The good shall be shipped per M.V. “Dong Feng” on November 10 and are due

to arrive at Rottedaml in 140 days. (M.V.= motor vessel)

on/upon 与 after

当英译“……到后,就……”时,用介词 on/upon,而不用 after,因为 after 表示“之后”的时间不明确。

例 7:发票货值须货到支

篇9:商务合同英译中容易混淆的词语

商务合同英译中容易混淆的词语

shipping1 advice 与 shipping instructions

shipping advice 是“装运通知”,是由出口商(卖主)发给进口商(买主)的。

然而 shipping instructions 则是“装运须知”,是进口商(买主)发给出口商(卖主)的。另外要注意区分 vendor2(卖主)与 vendee(买主),consignor(发货人)与 consignee3(收货人)。上述这三对词语在英译时、极易发生笔误。

abide4 by 与 comply with

abide by 与 comply with 都有“遵守”的意思.但是当主语是“人”时,英译“遵守”须用 abide by。当主语是非人称时,则用 comply with 。

例 3:双方都应遵守/双方的一切活动都应遵守合同规定。

Both parties Shall abide by/All the activities of both parties shall comply

with the contractual stipulations.

change A to B 与 change A into B

英译“把 A 改为 B”用change A to B,英译“把 A 折合成/兑换成 B”用change A into B,两者不可混淆。

例 4:交货期改为 8 月并将美元折合成人民币。

Both parties agree that change the time of shipment to August and change US dollar into Renminbi.

ex 与 per

源自拉丁语的介词 ex 与 per 有各自不同的含义。英译由某轮船“运来”的货物时用 ex,由某轮船“运走”的货物用 per,而由某轮船“承运”用 by。

例 5:由“维多利亚”货轮运走/运来/承运的最后一批货将于 10 月 1 日抵达伦敦。

The last batch5 per/ex/by S.S. “Victoria” will arrive at London on October

(S.S. = Steamship)

in 与 after

当英译“多少天之后”的时间时,往往是指“多少天之后”的确切的一天,所以必须用介词 in,而不能用 after,因为介词 after 指的是“多少天之后”的不确切的任何一天。

例 6:该货于 11 月 10 日由“东风”轮运出,140 天后抵达鹿特丹港。

The good shall be shipped per M.V. “Dong Feng” on November 10 and are due

to arrive at Rottedaml in 140 days. (M.V.= motor vessel)

on/upon 与 after

当英译“……到后,就……”时,用介词 on/upon,而不用 after,因为 after 表示“之后”的时间不明确。

例 7:发票货值须货到支付。

The invoice6 value is to be paid on/upon arrival of the goods.

by 与 before

当英译终止时间时,比如“在某月某日之前”,如果包括所写日期时,就用介词 by;如果不包括所写日期,即指到所写日期的前一天为止,就要用介词 before。

例 8:卖方须在 6 月 15 日前将货交给买方。

The vendor shall deliver the goods to the vendee by June 15.(or: before

June 16,说明含 6 月 15 日在内。如果不含 6 月 15 日,就译为 by June 14 或者 before June 15。)

扩展:谈判英语必备30句

1、Would anyone like something to drink before we begin?

在我们正式开始前,大家喝点什么吧?

2、We are ready.

我们准备好了。

3、I know I can count on you.

我知道我可以相信你。

4、Tust me.

请相信我。

5、We are here to solve problems.

我们是来解决问题的。

6、We’ll come out from this meeting as winners.

这次会谈的结果将是一个双赢。

7、Ihope this meeting is productive.

我希望这是一次富有成效的会谈。

8、I need more information.

我需要更多的信息。

9、Not in the long run.

从长远来说并不是这样。这句话很实用,也可显示你的“高瞻远瞩”。

10、Let me explain to you why .

让我给你一个解释一下原因。很好的转折,又可磨炼自己的耐心。

11、That’s the basic problem.

这是最基本的问题。

12、Let’s compromise.

让我们还是各退一步吧。嘴里这么说,心里可千万别放松。追求利润最大化是一种专业精神。

13、It depends on what you want.

那要视贵方的需要而定。没那么正规的场合下说:那要看你到底想要什么。

14、The longer we wait ,the less likely we will come up with anything.

时间拖得越久,我们成功的机会就越少。

15、Are you negotiable?

你还有商量的余地吗?

16、I’m sure there is some room for negotiation1.

我肯定还有商量的余地。

17、We have another plan.

我们还有一个计划。准备多么充分!胜利一定会属于这样的人!

18、Let’s negotiate the price.

让我们来讨论一下价格吧。

19、We could add it to the agenda.

我们可以把它也列入议程。

20、Thanks for reminding us.

谢谢你的提醒。

21、Our position on the issue is very simple.

我们的意见很简单。

22、We can not be sure what you want unless you tell us.

希望你能告诉我们,要不然我们无法确定你想要的是什么。

23、We have done a lot.

我们已经取得了不少的进展。

24、We can work out the details next time.

我们可以下次再来解决细节问题。

25、I suggest that we take a break.

建议休息一下。

26、Let’s dismiss and return in an hour.

咱们休会,一个钟头后再回来。

27、We need a break.

我们需要暂停一下。

28、May I suggest that we continue tomorrow.

我建议明天再继续,好吗?少提这种建议,中国人一定要学会如何在谈判桌“熬得住“,很多时候不是“技术战”而是“神经战”。

29、We can postpone2 our meeting until tomorrow.

我们可以把会议延迟到明天。

30、That will eat up a lot of time.

那会耗费很多时间。

合同翻译中最易混淆的词语

考研英语:基础期必须注意的要点

高中到底怎么学英语有哪些方法

考研英语词语复习

六年级上册语文老师工作计划

关于六年级语文上册教学工作计划方案

小学语文六年级的上册教学计划

六年级小学语文老师上册的教学计划

八年级语文背影易错知识

【大学英语六级经验】英语六级阅读高分应试技巧

合同翻译中最易混淆的七组词语
《合同翻译中最易混淆的七组词语.doc》
将本文的Word文档下载到电脑,方便收藏和打印
推荐度:
点击下载文档

【合同翻译中最易混淆的七组词语(共9篇)】相关文章:

商务合同英译中易混淆的词语2023-07-07

四年级上学期语文教学计划2022-10-08

小学六年级语文上册教学计划2022-05-06

小学六年级上册语文教学计划参考2022-07-24

四年级上册语文教学计划2023-02-17

简述语文教育2023-02-08

英语的颜色课件2022-08-28

声声慢的翻译2024-04-10

教育机构小学语文教学计划2022-11-13

高考语文冲刺知识考点复习2023-02-18

点击下载本文文档